Thorndon School, Wellington
153 Thorndon Quay
Pipitea, Wellington 6011
New Zealand
Overview
The rebuild of Thorndon School was completed in June 2019. The refurbishment consisted of a new administration block, the eastern classroom block (Te Pihinga) and the main classroom block. It also included the seismic strengthening of the existing White House structure (staff-room and library).
The purpose of the rebuild was to provide new innovative learning environments, with larger and more flexible learning spaces to encourage collaborative learning and other modern education methods.
The buildings are a mix of single and two stories with the structural system of the Main Block consisting of steel portal frames, braced frames and masonry walls with a suspended concrete slab. The Admin Block and Te Pihinga are a combination of masonry, steel and timber framing. The existing White House is a reinforced concrete structure strengthened with structural steel.
Design & Construction
The school remained operational throughout the entire construction process.
Other projects
Located in one of Wellington's well known heritage sites is the new head office and retail space for global skincare brand Antipodes.