Westpac Stadium

Westpac Stadium

Silvester Clark design were the structural engineers for the new office and changing rooms at the Westpac Stadium, completed in December 2012, and are the Structural Engineers for the new East and West Mezzanine Bars. 

The East Mezzanine Bar was completed in December 2013. The structure of the Mezzanine Bars cantilevers out from the stadium shell and has been designed to be as light weight as possible to minimise seismic loads on the existing stadium structure.  Some foundation strengthening works are also required

Completed
Offices and Changing Rooms 2012
East Mezzanine Bar 2013

Client
Wellington Regional Stadium

Architect
Populus

Contractor
T.B.C