We were required to infill the existing first floor stair well and the ground floor over the cellar below. The challenge was to get the materials into the building and lifted into place. They also had to have minimum impact in their final position.

A new stair (pictured above) was constructed from 56mm marine grade plywood. The plywood balustrade formed the only structural support and gives the impression it is floating. All fixings and support structure are concealed.

Completed
April 2004

Developer
Moxham Holdings Limited

Architect
New Work Studio

Contractor
Managed by developer